
06/12/2011 First Four Houses of “Minsk-City” Complex Ready to Be Accepted by the State Committee in December
01/12/2011 ITERA and TsMT SHELF, LLC made a Contract on choosing a drilling rig type intended for Block 21 in the Turkmen Sector of the Caspian Sea
|
27/01/2012 ITERA-GEORGIA completed work to ensure provision of gas supply to KvemoNikozi village
(Georgia Online (apsny.ge), Tbilisi)
10/01/2012 ITERA staff-members arranged a holiday for children from orphan homes located near Moscow
(RIA Novosti)
|
|
 |
 |
|

Itera hopes to launch Beregovoye field shortly
| 2006-08-29 |
Опубликовано: RBC, Moscow |
The Itera Oil & Gas Company hopes to have the Beregovoye oil and gas field (in the Yamalo-Nenets autonomous region) put into operation in October 2006, Deputy CEO of Itera and Chairman of the Board of Directors of Sibneftegaz Sergei Vorobyov told RBC today. He said having the field connected to gas transportation networks as soon as possible was in the interests of both Sibneftegaz and Gazprom. He said the field was ready, with no technical problems.
It will be possible to start working on the Beregovoye Field only after Gazprombank completes the acquisition of 51 percent of Sibneftegaz. A relative agreement was signed between Itera and Gazprombank on June 29. All legal procedures are about to be finalized and the deal is to be completed in September.
|
|

|